Course objectives: Students will develop and demonstrate their abilities to work in a team on a substantial software project. There are three conceptual parts to the project efforts expected of each team:
HTML version of the Lightweight Software Process document
On Time, Within Budget, E.M. Bennatan, Wiley, 1995.
|
|
Members | Advisor |
|
|
|
Fick, Jones, Karamali, Micallef, Mitchell |
|
|
|
|
Buxton, Craig, Sykora, Williams, Winbush |
|
Campus Tour |
|
|
Ali, Burns, Eagin, Forinash |
|
|
|
|
DeBinder, McIntosh, Morris,Wade |
|
|
|
|
Hadzibegovic, Radigan, E. Stevens,
Throckmorton, Tsai |
|
System |
|
|
Bowles, Doyle, McAdam, Spence, Thompson |
|
|
|
|
Bishop, Frishe, Lovel, Means |
|
|
|
|
Alderman, Berry, Garett, Salter |
|
|
|
|
Estler, Hughes, Nagashoma, Saxon |
|
|
|
|
Amis, Cardarelli, Choi, Handy, D. Stevens, Tran |
|
Simulation |
|
|
Castenada, Moy, Eze |
|
|
|
|
Burke, Labrecque, Macfarlane, Sears |
|
|
The project we are looking for is for a database to calculate the cost per hour to run a single or group of machines, the direct and overhead labor rates as we provide the fixed and variable costs. We are looking for a database that can record changes and project a profit and loss statement for a given period. We currently have been calculating these costs using MS Excel that link to many other sheets. I have included an example of what one file looks like and what type of information we are producing. I hope I have been descriptive enough and at the same time been brief enough to allow you to decide if you would like to peruse this project further.
I also have an Excel file that gives an example of the calculations
they want done.
Possible project: develop a simple simulation of the Medium Access Protocol
for a Hybrid-Fiber-Coax system. We have complex simulations. The purpose
of the simulation would be to develop it as a sequence of exercises for
a project for CS4251.