Design Validation & Integration Testing

10/2/00


Click here to start


Table of Contents

Design Validation & Integration Testing

V-model again

Terminology

Integration testing

Interface errors

Testing strategies

"Big bang" testing

Incremental testing

Meeting Scheduler example

Top-down testing

Meeting scheduler example

Top-down testing

Bottom-up testing

Meeting scheduler example

Bottom-up testing

Thread Testing

Process interfaces (complete system)

Thread testing (two separate builds)

Meeting scheduler example

Thread testing

Stress testing

Design (integration/stress) testing

Delivery and Acceptance Testing

Summary

Email: potts@cc.gatech.edu

Home Page: http://www.cc.gatech.edu/classes/AY2001/cs3300_fall/

Download presentation source