PART ITEM POINTS AVERAGE DESCRIPTION
Part A Part A Extra Credit      
  turnin 9/5    
  grade A    
  on time 5 4.8 -1 for each day late
  score 20 18.2 A+=20; A=19; B=17; C=15
  Part A Total 25 23.0  
Part B Part B Extra Credit      
  on time 5 5.0 I didn't verify turnin dates, so everyone gets 5
  describe mesh files 3 2.0 +3 for including a description of the input mesh files;
  drawing 5 2.8 +3 description/comments in code
        +2 if code segment included in text; +1 if there is a direct link to the appropriate code segment
  subdivision 5 3.8 +3 description/comments in code
        +2 if code segment included in text; +1 if there is a direct link to the appropriate code segment
  (16 imgs) 5 4.8 +5 for including all 16 images; partial credit for some images
  mesh files link 1 0.8 +1 include link to mesh files
  source code link 1 0.9 +1 include link to all source code
  Part B Total 25 20.0  
Part C Part C Extra Credit      
  turnin 9/24    
  on time 5 4.9 -1 for each day late
  surface normals 5 4.2 +3 description/comments in code
        +2 if code segment included in text; +1 if there is a direct link to the appropriate code segment
  shading 5 3.9 +3 description/comments in code
        +2 if code segment included in text; +1 if there is a direct link to the appropriate code segment
  colors+materials 3 2.2 +3 looks great; +2 looks good; +1 looks okay
  images 5 4.9 +5 for including good looking images; +3 if images are flat shaded instead of smooth
  source code link 1 0.7 +1 include link to source code
  inspiration 1 0.4 +1 include reference to the origin/inspiration for your program
  Part C Total 25 21.1  
Part D Part D Extra Credit      
  turnin 10/4    
  on time 5 4.8 -1 for each day late
  link to mesh files 1 0.6 +1 include link to your new input mesh files
  describe new mesh format 3 1.7 +3 for including a description of the new input mesh files;
  describe method + code segments 6 5.1 +3 for describing in your own words the general method
        +2 for including code or specific program description of your use of Bspline and Butterfly subdivision
        +1 for including code or specific program description of how you made the movies
  movie 6 5.0 +6 for smooth, clear animation of object changing shape in a movie format (partial credit)
  potentials/limits 3 1.0 +3 included a description of the potentials and limits of your system (partial credit)
  link to source code 1 1.0 +1 included a link to the source code
  Part D Total 25 19.1  
Project 2 Total   100 83.2  
Project 2 Extra Credit     0.9 +1EC for clever optimization/modification of butterfly subdivision
        +0.5EC for each additional movie file (more than 2)
        +1EC for including subdivision/lighting/animation instructional animation
        +1EC for downloading and using a nice 3D model