(1) Phase III Deliverables
(Revised): Send the following to quocminh@cc.gatech.edu by e-mail in a single zip file on
or before 11:59pm, 4th December 2006. The subject of the
mail and name of the zip file should include the text “CS4400 Phase
III” and the name of first group member.
- Copy of the Create
Table statements from Phase – II with any revisions. {Both Heavyweight
and Lightweight option}
- A set of working
SQL statements for all project tasks. {Those who have chosen Lightweight
Option}
- All Source code
files (documented) of functional GUI, embedded SQL Statements and other
coding that you have done in this project. {Those who have chosen Heavyweight
Option}
(2) Instructions and Guidelines
for Final Demo.
- You will give demo
to the “same” TA who has graded Phase I and Phase II of your
project. If you don’t know who has graded your project, send an e-mail
to quocminh@cc.gatech.edu for more information.
- The demo time slots
schedule for each TA has been put outside Prof. Mark’s office (CoC
Room No: 120) on separate sheets. You need to go there and sign
up for the time slot that you want for the demo. You have to write the name of one group member
against the time slot that your group want. (Note that this is on the first
come first serve basis). The sign up has to be done on or before 11:59pm,
4th December 2006. For any issues in time slots for the demo,
contact your respective TA.
(3)Preparation Tips for Final
Demo:
- The tables in your
system have to be populated before demo.
- Those who have chosen
Heavyweight option - You are expected to give a “System Walkthrough”
during the demo which will show the GUI screens in your systems in a
logical sequence of Task execution. Also make sure to show the different
things that your system can do.
- The assessment of
your project {both Heavyweight and Lightweight} will be heavily dependent
on the correct execution of tasks given in Information Flow
Diagram for Phase I.
So make sure that you implement all the tasks.