(1) Phase III Deliverables:
Submit the following to your respective TA on or before Monday, 3rd December 2007,
11:59 pm by e-mail. You should email a zip file to your TA (the TA who
graded your Phase I and Phase II of the project*). The subject of the mail
should be CS4400: Fall 07 – Phase III. The name of the zip file
should have name of one team member in it.
Submit the following as a part of Phase III deliverables –
- Copy
of the Create Table statements from Phase – II with any revisions. {Both
Heavyweight and Lightweight option}
- A set
of working SQL statements for all project tasks. {Those who have chosen
Lightweight Option}
- All
Source code files (documented) of functional GUI, embedded SQL Statements
and other coding that you have done in this project. {Those who have
chosen Heavyweight Option}
(2) Instructions and Guidelines for Final Demo.
- You
will give demo to the “same” TA who has graded Phase I and Phase II
of your project. If you don’t know who has graded your project, send an
e-mail to tusharsugandhi@gatech.edu
for more information.
- For
both heavy weight and light weight projects, students have to populate
tables on their own. No sample data will be provided to students for the
final demo.
- The
final grading of the Phase III will be based on both submitted documents
as well as final demo.
- The
demo time slots schedule for each TA will be put on class swiki page. You
need to go there and sign up for the time slot that you want for the demo.
You have to write the name of one group member against the time slot that
your group wants. (Note that this is on the first come first serve basis).
The sign up has to be done on or before Monday, 3rd December
2006, 11:59pm. For any issues in time slots for the demo, contact your
respective TA.
(3)Preparation Tips for Final Demo:
- The
tables in your system have to be populated before demo.
- Those
who have chosen Heavyweight option - You are expected to give a “System
Walkthrough” during the demo which will show the GUI screens in your
systems in a logical sequence of Task execution. Also make sure to show
the different things that your system can do.
- The
assessment of your project {both Heavyweight and Lightweight} will be
heavily dependent on the correct execution of tasks given in Information
Flow Diagram for Phase I. So make sure that you implement all the
tasks.
- There
will be 10% extra credit for Phase III. The extra credit is for features
implemented which are not given in project specification. Note that the
extra credit is not a replacement for the tasks you are supposed to
implement. It means you will get points of extra credit only when you
implement all the functionality that is expected by the specification.
- You
can find more demo guidelines here.
*If you don’t know who your TA is, send a mail to tusharsugandhi@gatech.edu for more
information.