Phase 1 revisions and alternate solutions
Revised Project description
| Alternate
solution to original project description (I) |
Solution to
revised project description (II)
Notes regarding the revised project description:
- The changes in the project description are shown in
red font.
Notes regarding the solutions:
- Return can be modeled according to any of the ways shown
in above solutions. However, if it is modeled according to one in II, there
must be a quantity associated with the relationship return.
- A subtle change to be noticed in II is that the customer
can have multiple credit cards and credit cards can be used by multiple
people. The example can be as follows: Son purchases using the credit card
of his father. Since there is an option on the checkout screen to enter a
new credit card information, son can enter details of his father's credit
card.
- The revised solution is vey similar to the original
solution posted about a month back.
Deliverables for phase 2:
- Go through the alternate solution above. If you feel you
will get some points back, attach the original EER diagram and on a separate
sheet mention if you need it to be re-graded along with places you feel you
can get the points back.
- All other deliverables as mentioned in the project
description.
- IMPORTANT: Mention section of each and every
member of the team on the front sheet along with the name of the TA who
graded your phase 1.