"Ball and Chain" Project Notebook

Winter Quarter 1996

Document Author:

Richard Sottilaro

Project Sponsors:

GregoryAbowd
Chris Atkeson

"Ball and Chain" Team:

Frankie R. Hill (Manager)
Dameon C. Kindall (Architect)
Sean Xie (Programmer)
Richard A. Sottilaro (Technical Wr iter)

CyberNag Overall Architecture Team:

Chris Farris
Zareer Siganporia

Contents


CyberNag Deliverables

Project Plan

A document describing the project team members, the projected schedule for the "Ball and Chain" project, and the individual team member's roles in the project. First version to be delivered 1/19/96.

Schedule

This is a list of the schedules, as they have been modified or updated. There is no delivery for this, and it is being constantly updated.

Requirements Document

A document describing the details of the requirements of the prototype that is to be delivered. This will include how the system will look and be used. First version to be delivered 1/29/96.

Design Document

A document describing system structure and how the system will be implemented from the requirements document. First version to be delivered 2/9/96.

Initial Prototype

This will be a running prototype of the "Ball and Chain" portion. First version to be delivered 2/23/96.

Hardware Information

This document will contain all of the necessary information about the hardware we used in the project. More specifically, it will contain information about our pager.

Project Notebook

This will be an ongoing notebook on the WWW, detailing the progress of the "Ball and Chain" project. A final copy of the Project Notebook is to be delivered on 3/6/96. The actual Notebook itself is the document you are currently viewing.


Last Modified 1/27/96 -- Richard Sottilaro (gt5557a@prism.gatech.edu)