You are to use this document as a template to prepare your Part 3 report. You should personalize it with a project logo or further objects, now or later.
Remember, a clear and succinct writing style is preferred. A long document does not impress me.
The team that produced the prototype and evaluation plan will be referred to as the Development team and the team executing the evaluation plan will be called the Evaluation team. To assist the Evaluation team in carrying out this part of the project, the Development team will nominate one member to act as consultant to the Evaluation team. It is expected that the consultant will assist the Evaluation team in understanding the prototype and getting it properly installed for evaluation. Therefore, the consultant will not be expected to play such a great role in evaluation for his or her own project team.
A note about this document. The final evaluation document will appear in the notebook for the Development team. Therefore, the look of the document should correspond to the look of the Development team's documents. The consultant can assist with this.
-->Cut Here<--
|
Winter Quarter 1996 Evaluation Team: [Development Project Name] Team: |
Write a one page description of the project you have selected. Discuss the general area of application, intended tasks it will support, and the intended user population.
This can be copied from the Part 2 report.
Carried over from Part 2 report as well.
Summarize the results of the three evaluation exercises to indicate how the design criteria were or were not met by the prototype. You should separate the results into three sections, one for each evaluation exercise.
Summarize the results of the three evaluation exercises to indicate how the design criteria were or were not met by the prototype.
Summarize changes to the prototype that are warranted by the results of the evaluations.
Here are the main points I want you to address in your critique: